Charger Forums banner
1 - 2 of 2 Posts

·
Registered
Joined
·
22 Posts
Discussion Starter · #1 ·
Does anyone know what mD1: Gateline schedule - scheduled to be built means?

Is the vehicle starting to be built? I have been waiting for over two months for the vehicle to be built.

Thanks
 

·
Registered
Joined
·
331 Posts
D1 should be good news. After being in plain D for about a month, mine was in D1 when I called on 10/19. It left the factory on 10/23, and I had it here in CA on 11/5. There's a sticky that explains what the codes mean, but obviously it's impossible to put a time frame on them. Look here for what the codes mean.

http://www.chargerforums.com/forums/showthread.php?t=1076
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top